DSCN1468.jpg
The sign goes up
DSCN1469.jpg
The first digger
DSCN1470.jpg
Pegs mark the carpark
DSCN1467.jpg
The site office arrives
DSCN1499.jpg
Earthworks begin
DSCN1500.jpg
Diggers at work
IMG_0672.jpg
Piping going in
IMG_0670.jpg
Metal for the carpark
IMG_0680.jpg
More piping
IMG_0710.jpg
Foundations
IMG_0712.jpg
Polystyrene under the floors
IMG_0711.jpg
The first slab is poured
IMG_0745.jpg
The next studio beging
IMG_0746.jpg
And another slab is poured
IMG_0747.jpg
Materials on site
DSCN1501.JPG
The first frame goes up
DSCN1507.JPG
Digger reflections
DSCN1508.JPG
Learning studio close up
DSCN1509.JPG
Learning studio interior
DSCN1510.JPG
Framing on 3 studios
DSCN1512.JPG
Official site visit
DSCN1513.JPG
Pipes
DSCN1514.JPG
Framing showing window
DSCN1515.JPG
One of the 'nooks'
DSCN1516.JPG
Looking towards teacher's room
DSCN1517.JPG
Another 'nook'
DSCN1518.JPG
Steel to support the roof
DSCN1519.JPG
DSCN1520.JPG
Driveway looking towards admin block
DSCN1521.JPG
Preparing the slab for the hall
DSCN1522.jpg
The skeleton of our school
IMG_0020.JPG
Crane onsite
IMG_0021.JPG
Crane lifting roof beams
IMG_0022.JPG
After the rain - a water feature!
IMG_0023.JPG
Our sign at the gate
IMG_0026.JPG
roof beam on the crane
IMG_0027.JPG
laminated roof beam
IMG_0028.JPG
sun through the roof beams
IMG_0029.JPG
learning studio
IMG_0030.jpg
view of windows and window seats
IMG_0031.JPG
and the field has grass!
IMG_0032.JPG
the crane for the beams
IMG_0034.jpg
eBoT in the studio
IMG_0035.jpg
Checking out the roof lines
IMG_0036.jpg
Framing and sky
IMG_0037.jpg
View of one of the 'nooks'
IMG_0038.jpg
Angles
IMG_0039.jpg
The beginnings of the hall
IMG_0046.JPG
The mould for the feature
IMG_0047.JPG
Library framing
IMG_0048.JPG
Steel supports on the hall
IMG_0049.JPG
Roof & building paper on studio 3
IMG_0050.JPG
Cladding on studio 3
IMG_0051.JPG
Safety netting during the roof building
IMG_0052.JPG
Roof beams
IMG_0053.JPG
Some of the insulation
IMG_0054.JPG
Window corner
IMG_0055.JPG
End of studio
IMG_0056.JPG
Cladding between the windows
IMG_0057.JPG
The covered walkway
IMG_0058.JPG
Inside framing
IMG_0059.JPG
Some of the winter rain
IMG_0068.jpg
Some of the insulation
IMG_0067.jpg
Cladding on the studio
IMG_0069.jpg
Windows installed
IMG_0070.jpg
Site visit
IMG_0071.jpg
Bifolds by the window seat
IMG_0072.jpg
Child level windows
IMG_0073.jpg
Beams on the hall
IMG_0100.jpg
Chasing for floor box
IMG_0101.jpg
Painting the beams
IMG_0103.jpg
Doors from studio 3 to courtyard
IMG_0104.jpg
Purple pipes for storm water
IMG_0106.jpg
Carpark
IMG_0107.jpg
Looking towards admin
IMG_0108.jpg
Gib and wiring
IMG_0110.jpg
e-BoT inspecting the cladding
IMG_0111.jpg
Scaffolding on the hall
IMG_0112.jpg
View from the driveway
IMG_0113.jpg
final part of the roof to complete
IMG_0114.jpg
the building team
IMG_0123-2.jpg
Working on the roof
IMG_0124.jpg
Final roof sheet
IMG_0126.jpg
Framing for the ceiling tiles in performance studio
IMG_0128-2.jpg
roof stained outside
IMG_0137.jpg
Final touches to the roof
IMG_0138.jpg
the leadership office
IMG_0142.jpg
windows
IMG_0143.jpg
Our courtyard
IMG_0144.jpg
Framing on the studio
IMG_0145.jpg
Diggers at work

IMG_0146.jpg
Courtyard
IMG_0148.jpg
View from the staffroom
IMG_0150.jpg
Front entrance
IMG_0151.jpg
The digger with the trees
IMG_0152.jpg
Cherry trees
IMG_0153.jpg
Trees being planted
IMG_0154.jpg
Plants ready for the front
IMG_0156.jpg
Portico in front of reception
IMG_0158.jpg
a few sheets of gib!
IMG_0159.jpg
Hall from the courtyard
IMG_0160.jpg
The courts
IMG_0161.jpg
Feature panels in process
IMG_0162.jpg
The window seats go here
IMG_0163.jpg
Courtyard
IMG_0164.jpg
Flowering Cherry
IMG_0165.jpg
Trees lining the carpark
IMG_0166.jpg
Just a few plants
IMG_0167.jpg
The rain garden
IMG_0168.jpg
Shadows at the front office
IMG_0170.jpg
RWC flags on the site
IMG_0172.jpg
Internal doors installed
IMG_0173.jpg
Courtyard looking west
IMG_0174.jpg
Courtyard looking south-west
IMG_0176.jpg
Carpark looking towards admin
IMG_0177.jpg
Cherries in flower
IMG_0178.jpg
Staffroom doors go in
IMG_0181.jpg
Doors from reception to courtyard
IMG_0182.jpg
Window in the SLT office
IMG_0183.jpg
From SLT office to library
IMG_0184.jpg
Looking out to the field
IMG_0185.jpg
The huge ply wall in the hall
IMG_0186.jpg
The switch cupboard
IMG_0187.jpg
Laying the concrete
IMG_0190.jpg
The first of the cabinetry arrives
IMG_0192.jpg
The ply wall
IMG_0193.jpg
Laying the cobbles outside the tech room
IMG_0194.jpg
Preparing for the cobbles
IMG_0195.jpg
New concrete paths